© 2026 EcoVoltec
Aerial view of a battery energy storage site: rows of BESS containers on a hillside platform beside woodland.
All Case Studies

Case Study · BESS · Substation

10MW / 25MWh BESS with 132kV Grid Connection

Client: Flex Power Energy

Capacity
10MW / 25MWh
Grid voltage
132kV
Location
Europe
Scope
7 disciplines

Full electrical design for a 10MW / 25MWh BESS facility connected to a European 132kV distribution network, including substation, protection, and SCADA design.

  • BESS
  • Substation Design
  • Protection & Control
  • SCADA
  • Cable Design
  1. 01

    The Challenge

    The project presented significant space constraints on site combined with a dense cable network spanning power, control, auxiliary, fire, and drainage systems. Coordination across multiple OEM suppliers — each with independent information release timelines — added further complexity and risk of design clashes.

  2. 02

    Our Approach

    EcoVoltec applied a structured onboarding and design implementation process, locking in a Design Strategy Milestone at 10% completion with a formal sign-off from all parties. Drawing on experience from 30+ large-scale BESS projects, the team produced a constructable, change-order-free first iteration. Constant internal cross-discipline communication eliminated the onsite clashes that typically arise when multiple subcontractors work in parallel. OEM consultation was used wherever specialist knowledge was required.

  3. 03

    The Result

    The project was delivered ahead of schedule with a visually polished, construction-ready drawing package. Flex Power Energy described the result as exceeding expectations — noting the professionalism, speed of delivery, and openness to revisions throughout the design process.

Services Delivered

  • 132kV Substation Design
  • Protection System Design
  • SCADA Network Design
  • BESS Cell-to-Container Design
  • Cable System Design
  • Electrical Secondary Design
  • OEM / Supplier Engagement
“It was a complicated project with 132kV substation, and the BESS System Design. EcoVoltec exceeded our expectations. Their work was visually appealing and highly professional, with an incredibly fast delivery time. Great results, and always open for revisions.”

Fabian Eckl

CTO, Flex Power Energy

Ready to start your project?

Tell us about your challenge and we'll get back to you within one business day.