Our Work

Case Studies

Real projects. Real outcomes. A track record built on technical depth, delivery speed, and long-term client partnerships.

25MWh / 10MW BESS with 132kV Grid Connection
BESS
Germany·25MWh / 10MW

25MWh / 10MW BESS with 132kV Grid Connection

Full electrical design for a 25MWh / 10MW BESS facility connected to the German 132kV distribution network, including substation, protection, and SCADA design.

View Case Study
500MW Grid-Scale BESS Project
BESS
United Kingdom·500MW

500MW Grid-Scale BESS Project

End-to-end electrical design for one of the UK's largest battery energy storage projects, delivering a full electrical and protection design package for a 500MW grid-scale facility.

View Case Study
120MW, 300MWh BESS Project
BESS
South America·120MW, 300MWh

120MW, 300MWh BESS Project

Complete electrical and SCADA design for a 120MW / 300MWh BESS facility in South America, including grid connection substation design and full secondary engineering package.

View Case Study
20MW Solar + BESS + Generators Microgrid
Microgrid
Bahamas·20MW

20MW Solar + BESS + Generators Microgrid

Integrated microgrid design combining solar PV, battery energy storage, and diesel generation to provide a stable, low-carbon electricity supply for an island community in the Bahamas.

View Case Study
50MW Solar Farm — Complex Terrain Design
Solar
United Kingdom·50MW

50MW Solar Farm — Complex Terrain Design

Full electrical and civil design for a 50MW solar farm on challenging hillside terrain, including 33kV substation, switchroom, and control room design.

View Case Study
EV, Solar, BESS, Substation Multi-Project Design Agreement
Solar
United Kingdom

EV, Solar, BESS, Substation Multi-Project Design Agreement

Ecovoltec acted as an embedded design partner for geositeservice, delivering electrical design across a portfolio of Solar, BESS, EV Infrastructure, and Microgrid projects under a multi-project design agreement.

View Case Study